UTC-005_Runtime_Supervisor_Readiness_Gates

Validate runtime supervisor startup readiness gates before entering run lifecycle.

Execution

Field

Value

Status

pass

Last Run At

2026-02-28T18:45:00Z

Last Runner

Dummy_Unit_Run

Result Summary

pass

Preconditions

Supervisor initialized and all required readiness events are controllable in test harness.

Procedure

  1. Dispatch startup without all gates and verify hold. 2) Assert all readiness events. 3) Dispatch transition cycle. 4) Verify run state entry.

Expected Result

Run state is reached only after all configured readiness gates are satisfied; state machine behavior matches defined lifecycle.

Traceability

Element Type

Referenced Elements

SW Units

SW State Machines

  • ao_runtime_supervisor_state

Evidence

n/a